Finally, the last of the lower fillets are laid and sanded.
Masking up.........
That's the end of the seventh month of construction............
Finally, the last of the lower fillets are laid and sanded.
Masking up.........
More Filleting
Well after a four-week break I'm back to the build and that means more fillets. It can't be underestimated the time you spend making fillets, did I mention fillets.
So armed with the following arsenal of filleting weapons it was time to attack the frames and bulkheads. I'll leave the bottom to hull side fillets to last, I should have them down pat by then.
After many hours and many beers, the frame and bulkhead fillets are done.
Now it's time to do the larger bottom to hull side fillets. I'll take extra care making these fillets as they are exposed and seen from inside the cabin.
The sections are thoroughly sanded, cleaned and masked up.
The joint is thoroughly wetted out prior to laying the fillets and peel apply rolled over the fillets.Thats the end of the Sixth month of construction...........
Two further overlapping glass tapes were added over the fillets between the transom and hull sides. Blue peel ply was smoothed over the wet glass tapes. As this was my first-time using peel ply, I chose a location that is hidden inside the lockers.
For the first fillets I decided to start in the aft area between bulkhead eight and the transom.
This is how I make fillets:
The wetting out of the joint prior to making a fillet produces a strong bond and prevents a dry joint.
I glued the transom in rather than epoxy welding to ensure a strong bond.
After a bit of a cleanup it’s time to start filleting.
In preparation for the next stages of the build I ordered the hull and sailing hardware package from Denman Marine the Aussie distributor located in Tasmania.
Here is their website:
https://denmanmarine.com.au