Well, another small part of the project completed.
I left the installation of the footwell floor to last to enable easy access to run the electrical wiring through the 25mm conduits.
I also installed two extra athwartship cleats to provide additional support for the footwell floor.
The footwell floor was sealed on the underside and holes marked and drilled in place ready for the temporary screws.
The temporary holding screws are prepared, and the cleats are covered with epoxy glue.
Finally, the floor is secured in place.
No comments:
Post a Comment