Finally, it's time to prepare the lower hull and sides before glassing.
The first job while the boat is upside down is to sand the underside of the rub rails.
This was no easy task due to my decision to build the rub rails from six laminated strips consisting of red gum hardwood and hoop pine. (see 10/10/2024 "Rub Rails" post)
Time to raise some saw dust and despite being connected to a vacuum I certainly produced a lot of dust.
After a couple of hours pushing the belt sander and breaking three 80 grit belts I managed to clean up the rub rail undersides.
I then spent the next hour sanding off all the epoxy blobs that flowed through some of the joins like stalactites.
I also needed to smooth the hull bottom to keel section in preparation to allow a smooth fillet.
It's been a while but time to mix up some epoxy filler.
Time to fill all the stitch holes and voids.
I used Q‑Cell which is made from hollow glass or ceramic microspheres. When mixed into resin, it:
Adds bulk without significant added weight.
Improves workability and flow
Provides reasonable compressive strength
Is easy to sand once cured.