Contact Email

My contact email: 1tgoding@gmail.com

Wednesday, June 28, 2023

Topside Work continues.

 After the upper hull sides and seat-back frames are epoxy tacked in place it was time to lay some fillets. Larger diameter fillets were layed between the hull sides and the topside panels, smaller fillets layed around the seatback frames.






I took my time with the fillets to reduce sanding. 







Leftover filleting epoxy was used to fill screw holes in the cockpit floor.




After sanding, the fillets and seat back frames are strengthened with fiberglass tape.





Thats the end of sixteen months of construction









No comments:

Post a Comment