In preparation for the flip and to reduce a bit of weight I removed the six hinged floorboard access sections. You will notice from the pic that I decided to install access hatches along the complete length of the cabin floor from BH 2 to BH 7.
Whilst removed and on a bench, I realised I hadn't completed a couple of things.
Firstly:
I installed some spring-loaded latches to secure the access hatches in a closed position no matter what the angle of the boat.
Unfortunately, when operating the latches through the finger hole from above the end would turn flat and made it difficult to get enough purchase to push completely open.
This pic shows the spring-loaded latch screwed in place. It freely slides along the timber blocks and the upturned end remains upright between the blocks.
Next the decorative Teak ring install.